Wednesday, October 18, 2017

HAMILTON Closes and Other Bad News

I just learned from a contributor that the famed B&O CPLs at HAMILTON interlocking in Hamilton, OH were cut over this past weekend.  One can also assume that surrounding CPLs have also been replaced.  Unlike the Broadway show there will be no touring production.


In other bad news, replacement signals have gone up at CP-ROCKVILLE and CP-HARRIS, which so far has seemed immune from NS's PRR Main Line signaling blitz.  The "new" PRR PLs at Rockville will be an especially hard loss.  The signaling dates from the late 1980's.


I can also report that the pneumatic point machines have been replaced by electric M23's at CP-HUNT and on the former N&W H-Line, the last bunch of PLs on the northern segment have also fallen.


Finally, the new signals at CP-ALLEN have cut over, replacing former Reading searchlights.  Status of the eastern Reading Line Rule 251 ABS is unknown at this point.

Wrong railing no more.  West on former E/B tk 2.

2 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. I can only assume that the work effort in Hamilton included the removal of the Fairfield Cantilever at Symmes. I noticed it was gone on Thursday, October 19th.

    https://position-light.blogspot.com/2016/05/fairwell-fairfield-cantilever.html?m=0

    ReplyDelete