Search This Blog

Sunday, September 21, 2025

NAN Drawbridge: A Crazy Thing We Lost

While this is ostensibly a blog about railroad signaling, I'll sometimes cover related bits of historic technology like railroad telecom systems, electrification systems and drawbridges. Today I get to cover two of those topics at once. Located on the former New Haven Railroad Shore Line, the Niantic River Drawbridge sat at the mouth of the Niantic River in the town of, you guessed it, Niantic, CT. A former New Haven Railroad signaling station, the 1907 bridge would later take the name NAN in the Penn Central and would serve as a staffed interlocking and block station up until the Boston electrification project of the late 1990's. Due to the New Haven being in perpetual bankruptcy NAN saw little in the way of upgrades and was documented by the Library of Congress before the changes of the NEC Improvement Project. While a chain-driven rolling lift bascule bridge is pretty cool in and of itself, it was the electrification project that provided "Old Nan" with one heck of a curtain call.


Railroad movable bridges have to employ complex mechanisms to separate the running rails and unlock the bridge, however when overhead electrification is involved a separate yet equally important system to isolate the contact wire across the movable span must also be employed. Because the 1907 NAN bridge was not electrified for its first 93 years of existence, this system had to be retrofitted onto the rolling bascule span in situ.  


On the contemporary Pellham Bay bridge, which was electrified within a decade of construction, a mechanism isolates the dynamic tension contact wires, while an alternate routing takes the 12kv lines up and over the waterway. The span then rolls back causing the wires across it to sag down to touch the track structure.  (I have seen a photo of this, but cannot currently locate it.) However when NAN was electrified in the 1990's, Amtrak had to use a fancy constant tension solution and in this case that meant a solid aluminum rail type conductor running the length of the span. Now, if you're sharp you might already realize that when the bascule span rolls back, a solid rail can't bend and flex with it. Well, this video shows the solution.  

That's right, a traveling telescoping carriage would move back and forth to extend and withdraw the contact rails from below the rolling structure of the bridge. What's even crazier was that NAN was the busiest drawbridge on the NEC due to a low clearance of 11 feet and a steady stream of boat traffic. Due to complaints from boaters, an agreement with the Coast Guard in 2003 limited closings to "only" 48 per day, so in its final decade of service, Old Nan was putting on quite the show. Unfortunately the 1907 bridge was finally replaced in 2012 by a new bascule span with greater clearance to reduce the need for openings. Fortunately its presence in plain view right downtown allowed for many to personally experience the show and record it for posterity. 

 

Sunday, September 14, 2025

MBTA's Everything's Alright Signal

Those who find themselves looking down the MBTA Red Line's distinctive open span subway tunnels might be forgiven if they sometimes think their eyes are playing tricks on them. One moment a lunar white wayside marker signal is visible, the next moment it has seemingly vanished. Those with above average powers of observation might also notice that these signals are facing against the standard current of traffic and also vanish in the minutes before a train's arrival. These are worker protection or "TAK" lights for "Train Approach IndiKator" (also called "snitch lights") and their job is to illuminate when everything is alright, and extinguish when a train is approaching.  

Light on, all clear.

Light out, train approaching.

 

As one might have guessed these use track circuit state to indicate when a train is approaching in a failsafe manner. Placement of the TAK lights appears to have been around curves or other situations that limit the sight lines of track workers. They seem to have been designed for the older single direction ABS system and may only still be in service in the tunnels as the few I have seen on the above ground Braintree Branch appear to be bagged. 


TAK lights are one of those things that you never notice until someone points them out, then you can't help but notice. Back before the real time departure information they were a life hack to know if a Red Line train was approaching, but today, unless you are a track worker, they are mostly a neat bit of trivia. 

Sunday, September 7, 2025

LINCOLN Lefty: Story of the PRR's Left Handed Dwarfs

 Anyone looking at the NORAC signal aspect charts may have noticed that the familiar PRR dwarf position lights have a curve to them (or yaw) that can go both ways. For all four dwarf indications, Slow Clear, Slow Approach, Restricting and Stop, one will see two entries on the diagram chart, one with a left hand curve and one with a right hand curve. To the uninitiated this can be dismissed as having to do with clearances or which side of the track a dwarf signal is placed, but it actually represents a fairly early change by the PRR to make a more practical signal vs a more conceptually accurate signal. 

The first PRR position light signals were designed as a replacement for semaphores. Version 1 or "tombstone" position lights (due to the shape of the backing) consisted of 4-lamp lines with an off-center pivot point that directly mirrored the shape and function of a semaphore blade. The position light dwarf signal was no different, but used two lamps to mimic the right to left sweep of a dwarf semaphore. Originally only three positions were provided, stop, low speed prepared to stop and low speed, again matching the function of the dwarf semaphore. 


Between 1918 and 1925 the three lamp system with circular mounting became standard for high signals, but the dwarfs, unable to be simplified further, retained the design aesthetic of a semaphore blade sweeping out a curve. The one major change was that someone noticed that the 4-lamp PL dwarf could display the reverse \ for free and a distinction between "proceed expecting stop" and "proceed expecting obstruction" was able to be made. The result was the left-handed dwarf position light.


Made of cast iron by Union Switch and Signal, the left hand dwarf had bulb access hatches on both the straight and curved sides. The rest was a sealed unit with a small vent on the back. 
 

This model of PL dwarf would go on to be installed at all the great PRR signaling achievements of the 1930's such as ZOO and HARRIS, however the march of progress is never satisfied and the desire to simplify the design merged with the desire to reduce confusion. The new dwarf would be reversed such that the curve would proceed in a high hand direction with the Restricting \ position being reduced in size compared to the Slow Approach / Position. The design was also changed to one with a single large rear access door, possibly enabled through advances in large gasket technology. 

The new style position light proceeded to almost entirely replace the old, especially as the staffed interlocking towers and their electro-mechanical interlocking machines were replaced by CTC starting in the 1970's. By the 21st century left handed PL dwarfs were a rare sight with most appearing at those parts of Amtrak and Conrail territory that had escaped re-signaling since the 1930's. However while out at LINCOLN interlocking on Amtrak's Northeast Corridor in Metuchen, NJ, I spotted a left handed survivor  governing movements out of the MoW yard.


Somehow escaping replacement in the early 90's when LINCOLN tower was closed and re-signaled, LINCIOLN's 5W dwarf is now one of the more accessible left-handed PL dwarfs, mounted on the side girder of the Lake St bridge for all to see.



Hopefully it will escape scrutiny and continue to perform its job for years to come.