Search This Blog

Wednesday, April 30, 2025

New Signals Up At THORN

 Although not much has changed regarding the ultimate fate of THORN tower, recent photos do show what the new signaling situation is going to look like. In the eastbound direction the triple signal bridge covering tracks 1, 2 and 5 Running, have gotten the Safetrain upgrade with Rule 562 'C' boards turned. Although not yet in photos, it is expected that track 4 will also be getting a PL mast signal to replace the existing reverse direction dwarf. SEPTA is tentatively resuming service to Coatesville upon the completion of new station facilities in 2025 which includes a semi-restoration of #2 track to a point just past the new station for the daily NS regional freight. 

In the westbound direction new PL masts are up on tracks 1 and 2 to replace the reverse direction dwarfs and its assumed that a new gantry mounted signal will be in store for #4 track.  The real surprise is what looked to be a new westbound full PL mast signal on what used to be the Low Grade Freight Line track. The old THORN had maintained a vestigial signal in that same location, but despite the rationalization of the former 6-track full crossover, it seems the low grade stub track has not only been retained, but is being prepared for use. What that use might be remains to be seen, but a mast capable of displaying Medium and Limited speed signals could imply SEPTA trains making some sort of switchback maneuver after discharging on Thorndale's track #4 platform or coming out of some yet to be built storage tracks on the footprint of the old PRR Thorndale facility. 

The THORN interlocking cutover is still planned for later in June with DOWNS to lose its switches before complete removal. GLEN and FRAZER will be turned over to the dispatcher by the end of 2025 closing THORN as an active interlocking station.

No comments:

Post a Comment