In yet more fallout from the NS purchase of the former D&H Main Line, the re-signaling ax has hit the siding in Afton, NY after randomly bouncing around the line between Schenectady and Sunbury, PA. The real shame was that at least the north end of the siding, CPF-587, was on track to stay searchlit under CP ownership.
As of 2014 CPF-587 had two CP type GRA SA searchlight masts on the south end that replaced a D&H style searchlight bracket at some point between then and 2008.
CPF-587 also had a D&H vintage single track cantilever mast at the north end that remained untouched until the summer of 2022(!) when a Canadian Pacific in-house type searchlight mast went up.
It is unclear if this was part of a long term Canadian Pacific plan that NS management later nixed or just something NS scraped together as a temporary measure, but by fall 2023 both the out of service bracket and active cantilevers were gone with Darth Vaders and a new relay hut in place.
Although this was always to be expected and CP was in the midst of its own scattershot re-signaling of the D&H line. It is a major shame to lose one of the best preserved interlockings on the route in so short a space of time. Unfortunately the D&H route is well off the beaten path and I my best efforts have only allowed me to nibble at the ends. If you live in the I-88 corridor please do your best to get some photos at those interlockings that remain.